After Nygard removed his driveway and was about to pour a new one, an Orono inspector told Nygard that he needed a permit. The next day, Nygard finished the driveway and applied for a permit. The new driveway was narrower than the previous one. The city responded with a form, imposing several conditions. Nygard crossed out some conditions, initialed the modified form, and returned it. After several exchanges, the city notified Nygard that he must agree to the conditions or “this matter will be turned over to the prosecuting attorney.” Nygard did not acknowledge the conditions. A police officer drafted a statement of probable cause, alleging that “work had been completed without having first obtained a permit” and listing some alleged deficiencies in its construction. According to the Nygards, the police did not inspect the property and some allegations were not true.Nygard was acquitted of violating the city code. The Eighth Circuit affirmed the dismissal of his suit under 42 U.S.C. 1983, claiming the code was void for vagueness and alleging First Amendment retaliation, abuse of process, and malicious prosecution. Nygard’s prosecution was not based on falsehoods. The report did not claim that the conditions were required by the code but that Nygard had not agreed to the conditions and had replaced a driveway without a permit. Any failure to investigate did not defeat probable cause; the city already knew that he installed a driveway without a permit. View "Nygard v. City of Orono" on Justia Law

by
The Supreme Judicial Court vacated the judgment of the superior court affirming the decision of the Town of Boothbay Harbor's Board of Appeals (BOA) denying 29 McKown, LLC's administrative appeal from a code enforcement officer's (CEO) decision to life a stop work order he had issued to Harbor Crossing during the construction of the building, holding that 29 McKown was deprived of administrative due process.In this case concerning a real estate office building constructed by Harbor Crossing in Boothbay Harbor, 29 McKown sought review of the denial of its McKown's appeal. The superior court affirmed the BOA's decision. The Supreme Judicial Court vacated the order below, holding (1) 29 McKown was deprived of administrative due process; and (2) the CEO did not issue a judicially-reviewable decision in lifting the stop work order. View "29 McKown LLC v. Town of Boothbay Harbor" on Justia Law

by
The Supreme Court affirmed the judgment of the appellate court concluding that the Home Improvement Act (Act), Conn. Gen. Stat. 20-418 et seq., did not apply to work performed by Defendant on Plaintiff's property, holding that Plaintiff's claim under the Act was unavailing.The trial court found in favor of Plaintiff on his claims alleging breach of contract, violations of the Act, and violations of the Connecticut Unfair Trade Practices Act (CUTPA), Conn. Gen. Stat. 42-110a et seq. The trial court ruled in favor of Plaintiff. The appellate court affirmed with respect to the breach of contract count but reversed with respect to the remaining claims, ruling that the work performed by Defendant fell within the new home exception of the Act, and therefore, Plaintiff failed to state a claim under both the Act and CUTPA. The Supreme Court affirmed, holding that the work performed by Defendant fell within the new home exception. View "Winakor v. Savalle" on Justia Law

by
The Supreme Court reversed the decision of the court of appeals affirming an order of the circuit court that granted partial summary judgment to Riverworks City Center, LLC after determining that Great Lakes Excavating, Inc. fully waived its construction lien, holding that the waiver document satisfied Wis. Stat. 779.05(1).Before signing the form lien waiver document the owner of Great Lakes cross of the words "To Date" in the document's title of "Waiver of Lien to Date" and replaced them with the handwritten word "Partial" with initials next to the change. On appeal, Great Lakes argued that the change limited the lien waiver to the amount received under Wis. Stat. 779.05(1) and that extrinsic evidence showed that all parties intended the waiver to be partial. The Supreme Court agreed and reversed, holding that the waiver document "specifically and expressly" limited the waiver under the statute. View "Great Lakes Excavating, Inc. v. Dollar Tree Stores, Inc." on Justia Law

by
The Supreme Court affirmed the decision of the court of appeals and the district court on the questions of lien validity and priority in this mechanics' lien case, holding that there was no error.Law requires that general contractors and owner-builders post a notice of commencement of work to Iowa's centralized, internet-based registry for mechanics' liens within ten days of starting work on a residential construction project. In the instant case, the owner-builder did not post notices of commencement on the registry for the five residential lots that it was developing, but two subcontractors did so several months after construction had begun. When the project went into default, a priority dispute arose between the two subcontractors and the project's commercial lender. The district court and court of appeals found for the subcontractors. The Supreme Court affirmed, holding (1) Iowa Code 572.13 did not change the principle that mechanics' liens will, in some circumstances, have priority over previously-recorded mortgages; and (2) the ten-day deadline for posting the notice of commencement to the registry applies to general contractors and owner-builders but not to subcontractors. View "Borst Brothers Construction, Inc. v. Finance of America Commercial, LLC" on Justia Law

by
Cal-Am, a developer and operator of RV and mobile-home parks leased the Yuma Sundance RV Resort from its owner, intending to construct a new banquet and concert hall on the property. The property owner provided the funding for the construction. Cal-Am managed the project. Cal-Am hired a contractor, Nickle, to design and construct the hall, who then hired Edais Engineering to survey the property and place construction stakes to mark the Hall’s permitted location. No contract existed between Edais and Cal-Am. Edais acknowledges that its placement of the stakes was defective. Cal-Am was forced to adjust its site plan, eliminating eight RV parking spaces. Cal-Am sued Edais for claims including negligence. The trial court granted Edais summary judgment on the negligence claim finding that Cal-Am could not recover its purely economic damages. The court of appeals affirmed.The Arizona Supreme Court affirmed, repudiating its 1984 Donnelly Construction holding that a design professional’s duty to use ordinary skill, care, and diligence in rendering professional services extends both to persons in privity with the professional and to persons foreseeably affected by a breach of that duty. Under Arizona’s current framework, which repudiated foreseeability as a basis for duty, design professionals lacking privity of contract with project owners do not owe a duty to those owners to reimburse purely economic damages. View "Cal-Am Properties, Inc. v. Edais Engineering, Inc." on Justia Law

by
Blue Appaloosa, Inc., appealed a judgment affirming an Industrial Commission order determining it violated N.D. Admin. Code ch. 43-02-03 by beginning construction of a treating plant prior to obtaining a permit or filing a bond with the Commission. Finding no reversible error, the North Dakota Supreme Court affirmed. View "Blue Appaloosa v. NDIC" on Justia Law

by
In federal court, Plaintiff Timothy Martin sued the Department of Corrections (DOC) and three DOC-employed medical providers, alleging Eighth Amendment to the United States Constitution violations under 42 U.S.C. 1983, and medical malpractice under state law. Following the defendants’ motion for summary judgment, the federal district court certified three questions of Washington state law to the Washington Supreme Court, all relating to whether RCW 7.70.150’s requirement of a certificate of merit for medical malpractice suits against state agents was constitutional. The Washington Court held that RCW 7.70.150 was invalid on its face based on Putman v. Wenatchee Valley Med. Ctr., PS, 216 P.3d 374 (2009), and on statutory language that did not differentiate between private and public defendants. Because the Supreme Court answered certified question 1 in the affirmative, it did not reach the federal court's remaining questions. View "Martin v. Dep't of Corrections" on Justia Law

by
The Supreme Court affirmed the judgment of the district court dismissing Plaintiff's complaint against the State alleging that Nevada's system of public education had failed its students, holding that Plaintiff's claims were nonjusticiable.Appellants - nine parents of students attending public schools in the districts of Clark, Washoe, and White Pine Counties - sued State education agencies and officials alleging that Nevada's system of public education failed to achieve the standards that she argued were required for a sufficient, basic education under Nev. Const. art. 11, 1,2 and 6. In dismissing the complaint, the district court determined that the claims presented nonjusticiable political questions. The Supreme Court affirmed, holding that Appellants' complaint did not present justiciable questions appropriate for adjudication. View "Shea v. State" on Justia Law

by
Koch Construction, Inc.; Marilyn Koch, Personal Representative of the Estate of Michael P. Koch; and Koch Property Investments, Inc. (collectively “appellants”) appealed the judgment and amended judgment entered in favor of Toman Engineering Company (“Toman”). Michael Koch owned and operated Koch Construction and Koch Property Investments (“KPI”). Toman provided engineering services to Koch Construction on various projects, including designing a stormwater management system for the Koch Meadow Hills residential development project in Dickinson, North Dakota. Michael died in August 2017. The stormwater management system included a detention pond referred to as the Marilyn Way Stormwater Pond, which was the detention pond at issue in this case. In 2016, Janet Prchal, Dean Kubas, and Geraldine Kubas, owners of property near the Koch Meadow Hills development, sued the City of Dickinson and KPI for damages, alleging the development of Koch Meadow Hills caused water to drain and collect on their properties. The Prchal lawsuit was settled in September 2018, and the settlement required modifications to be made to the Marilyn Way Stormwater Pond before June 30, 2019. The reconstruction work on the detention pond occurred during the summer and fall of 2019. Toman served a summons and complaint on Koch Construction and Marilyn Koch, to collect unpaid amounts for engineering services Toman provided to the defendants in 2017. Toman filed the complaint in the district court in June 2019. The appellants argued the district court erred in deciding they committed intentional spoliation of evidence and dismissing their counterclaim as a sanction. After review of the district court record, the North Dakota Supreme Court concluded the district court abused its discretion when it dismissed the appellants’ counterclaim as a sanction for spoliation of evidence. Judgment was reversed and the matter remanded for a new trial. View "Toman Engineering Co. v. Koch Construction, et al." on Justia Law