Abajian v. TruexCullins, Inc.

by
In 2001, plaintiffs Margaret and John Abajian hired architectural firm TruexCullins, Inc., to design additions to their home. Plaintiffs hired Thermal Efficiency Construction, Ltd. (TEC) to serve as the general contractor for the project. TEC contracted with Murphy’s Metals, Inc. to do the roofing work. The roof was installed during the winter of 2001-2002. Plaintiffs had experienced problems with ice damming on their old roof, which was shingled. Defendants recommended that plaintiffs install a metal roof to alleviate the problem. Plaintiffs accepted the suggestion, hoping that the metal roof would result in fewer ice dams. Mr. Abajian testified in his deposition that he “thought that the metal roof was going to eliminate” the ice damming. In 2014, after the roof turned out to be defective, plaintiffs sued the architecture and construction firms that designed and installed the roof for negligence and breach of contract. The trial court granted summary judgment to defendants on the ground that the action was barred by the statute of limitations. Finding no reversible error in the grant of summary judgment to defendants, the Vermont Supreme Court affirmed. View "Abajian v. TruexCullins, Inc." on Justia Law